RN Shipbuilding Programme 2005

28 August 2004

This page provides a quick "snapshot" summary of the RN's shipbuilding programme as at August 2005.

 

Table 1: MOD Naval Orders - By shipyard at given dates
Shipyard(s)

August 2005

August 2007
(Projected)
August 2009
(Projected)

DML Appledore Shipbuilders, Devon

None None None

BAE Systems Naval Ships, Govan and Scotstoun

LSD(A)s

Type 45 destroyers

Type 45 destroyers
CVF

BAE Systems Submarines Business, Barrow-in-Furness

Astute submarines Astute submarines Astute submarines
CVF?
Swan Hunter, Tyneside LSD(A)’s None CVF?

VT Shipbuilding, Portsmouth

N/A Type 45 destroyers Type 45 destroyers
CVF

 

Table 2: MOD Naval Equipment Acquisition Projects – Future Projections

Ship Class

Builder(s)

Displacement,
Full Load (tonnes)

Number Planned

Main Gate Year , actual or (planned)

Number ordered by 31 August 2005

Target In-Service Date  (First of Class) [1]

Estimated Project Budget

Astute class SSN

BAE Systems Submarines, Barrow

About 7,000 (surface)

8

1997

3

2009

£3.5 billion (first 3 units only)

Type 45 Destroyer BAE Naval Ships, Govan and Scotstoun; VT Group, Portsmouth 7,350

8

2001

3+3 2009 £5.5 billion (first 6 units only)
Landing Ship Dock (Auxiliary) Swan Hunter, Tyneside; BAE Naval Ships, Govan 16,160

4

2000

4 2007 Approx £400 million [4]
Future Aircraft Carrier Probably BAE Naval Ships; Swan Hunter, Tyneside; VT Shipbuilding, Portsmouth; Babcock DES, Rosyth About 65,000

2

(2006)

0 2012 [2] Approx £3.5 billion [4]
Military Afloat Reach & Sustainability ? Up to 40,000

9?

(2008)

0 2011 Approx £2 billion [4]
OPV(H) VT Shipbuilding, Portsmouth; 1,850

1

2004

0 2007 £30 million (lease arrangement)
Medium-sized Vessel Derivative ? About 7,350 [3]

4

?

0 2016 Approx £2 billion [4]
[1] The in-service date may be 6-12 months after the ship was completed and delivered by the shipyard.

[2] A two year slippage is expected.

[3] Assuming a Type 45 hull.

[4] Unofficial estimate.   

 

Chart 1: MOD Naval Equipment Programmes from 2005 to 2020.
 Schedules are illustrative only.

 

 